Pilot catalogue · Proposed prices, editable before launchCONTAINER ORIGIN / 01
Back to catalogue

CONTAINER ORIGIN / Project guides

Shipping container delivery: access and unloading

Shipping container delivery: access and unloading. Indicative prices in EUR. Transport and unloading to confirm for your site.

  1. 1. Locate the destination

    Give the full Eircode and locality; for land without a building, add an entrance landmark and access road. Eircode: all 7 Eircode characters. Format example: D02 X285. Use your site’s code, not this example.

  2. 2. Describe access

    Specify passage width and height, turns, slopes, obstacles and time restrictions. Supply photos or a plan if requested by the supplier.

  3. 3. Prepare the location

    Describe placement and ground condition. Have supports, levelling and door clearance validated for your intended use.

  4. 4. Define unloading

    State whether suitable equipment is available or must be included. The supplier confirms the vehicle, handling and access conditions. To start comparing a specific reference, see Container 20 ft Standard · Used · last trip · Beige.

Transport and unloading are quoted for your destination. Submitting the form is a no-obligation request; availability and the full cost are confirmed in the proposal.

Prepare my request

From the truck to your site

Plan access and placement together. These three views help you describe your site to the supplier.

Crane unloadingSide view: a truck-mounted crane with stabilisers, lifting a container from its four upper corners above the placement area.

Crane unloading

A truck-mounted crane can place the container from a suitable working area. The supplier confirms the vehicle, lifting reach and space needed for its stabilisers.

Access & manoeuvringTop view: a gate, truck, approach route and container position, with clear manoeuvring space.

Access & manoeuvring

Provide gate width, bends, slopes and obstacles. The access route must suit the selected truck, all the way to its unloading area.

Ground & door clearanceTop view: a container at its final position, with two open doors and swing arcs. A spirit level represents ground preparation.

Ground & door clearance

Prepare a stable, level position. Leave space in front of the doors for their swing and handling goods; the supplier confirms suitable supports.

4 details to share

  • Gate and manoeuvring space
  • Ground type and stability
  • Overhead cables, branches and obstacles
  • Final position and door clearance

Illustrative diagrams, not to scale. The supplier confirms vehicle dimensions, distances and unloading method for your site.

YOUR DESTINATION

A container for your project · Ireland

Your project for Ireland: use this guide to prepare placement alongside the technical container choice. Add a visible landmark or entrance instructions when the address alone is insufficient. Describe the route from the access road to the unloading point, including any narrow passages.

Catalogue prices in EUR

Container prices exclude tax, transport and unloading. The supplier’s proposal details these separately.

View models and prices

Prepare your address

Eircode · Format example
D02 X285
Local format
Full 7-character Eircode

Give the site’s full Eircode and locality. For land without a building, add a precise entrance landmark and the access road.

From truck to final position

Describe gate width, manoeuvring space, ground conditions and overhead cables or branches. Say whether you have lifting equipment or need a crane truck.

Prepare for delivery

Delivery feasibility, vehicle, unloading and timing are confirmed for the supplied address. Selecting a country does not confirm local availability.