Pilot catalog · Proposed prices, editable before launchCONTAINER ORIGIN / 01
Back to catalog

CONTAINER ORIGIN / Project guides

Office container equipment: insulation and fittings

Office container equipment: insulation and fittings. Indicative prices in USD. Transport and unloading to confirm for your site.

Compare an office container as a workplace. Occupancy, working hours and climate determine equipment requirements. Separate the offered base configuration from options and site works so that supplier offers cover equivalent services. Your project for United States: use this guide to prepare placement alongside the technical container choice. If the land is away from the stated street, add directions to the entrance and a landmark. Say whether you have lifting equipment or need unloading included in the proposal. To start comparing a specific reference, see Container 20 ft Office · Used · last trip · Beige.

Draw workstations and circulation space

Position desks, chairs, storage and walkways on a dimensioned internal plan. Add open doors, windows and appliances. State simultaneous occupancy and the intended use: reception, site office or daily workspace. External length alone does not establish workstation capacity.

Compare thermal comfort and fresh air

Request roof, wall and floor insulation details, glazing and shading. Provide climate, orientation and working hours to size heating or cooling. Ask separately how fresh air enters: air conditioning does not automatically replace ventilation.

Itemise power and equipment

List sockets, lighting, appliances, networking and available site power. Request the electrical plan, connections and checks. Furniture, air conditioning, toilets and kitchenette must be listed as included or optional; a picture alone does not put them in the price.

Confirm placement and handover

Send ZIP code, plan, photographs and access details. Specify supports, leveling, connections and wastewater arrangements if requesting toilets. Check local requirements for the use and installation duration with relevant professionals. At handover, match the inventory, checks and layout to the agreed offer.

Compare equipment on equal terms

EquipmentWhat to compareWhat to put in the offer
Insulation and windowsRoof, walls, floor, glazing and shading.Composition and properties of the offered unit.
Heating and coolingUse, hours, climate and required capacity.Appliance, installation, controls and servicing.
Power and networkSockets, lighting, appliances and site supply.Plan, connection, checks and included work.
Furniture and toiletsInternal layout, occupancy and water needs.Inventory, options and your connection responsibilities.

CONTAINER ORIGIN

Information to send to the supplier

  • Occupancy and working hours.
  • Internal layout with furniture.
  • Climate, orientation and comfort needs.
  • Sockets, lights and appliances.
  • Included inventory and separate options.
  • Placement, connections and ZIP code.

Explore suitable models

Compare catalogue references

Container prices exclude tax. Delivery and unloading are quoted using your ZIP code. Specify equipment and the actual offered unit’s performance in the supplier offer.

Practical questions

Is air conditioning included in the price?

Only the offer inventory establishes this. Request model, capacity, installation and commissioning, then check the site supply. Include servicing and condensate disposal when comparing the scope.

How many people fit in a 20-foot office?

That depends on usable layout, desks, circulation, ventilation and requirements at the installation site. Prepare a dimensioned furniture plan and validate occupancy; size alone does not set a capacity.

Can I add toilets or a kitchenette?

Describe the requested fittings precisely. Obtain prices for occupied space, water supply, drainage, power and site works. An office listing does not automatically include these conversions.

Can I use the office immediately after delivery?

Distinguish delivery, positioning, connections and commissioning in the offer. Prepare supports, access, power and checks for the agreed configuration and identify who performs each task.

What should I prepare to request a project quote for United States?

Give the city, state, ZIP code and physical address; a PO box does not describe the placement site. ZIP code: 5 digits, retaining any leading zero. Format example: 10001. Use your site’s code, not this example. If the land is away from the stated street, add directions to the entrance and a landmark. Say whether you have lifting equipment or need unloading included in the proposal. The proposal should confirm transport, unloading, availability and timing for this site.

YOUR DESTINATION

A container for your project · United States

Your project for United States: use this guide to prepare placement alongside the technical container choice. If the land is away from the stated street, add directions to the entrance and a landmark. Say whether you have lifting equipment or need unloading included in the proposal.

Catalog prices in USD

Container prices exclude tax, transport and unloading. The supplier’s proposal details these separately.

View models and prices

Prepare your address

ZIP code · Format example
10001
Local format
5 digits; keep any leading zero

Provide the ZIP code, city, state and physical site address. A PO box does not describe where to place the container.

From truck to final position

Describe gate width, maneuvering space, ground conditions and overhead cables or branches. Say whether you have lifting equipment or need a crane truck.

Prepare for delivery

Delivery feasibility, vehicle, unloading and timing are confirmed for the supplied address. Selecting a country does not confirm local availability.